On a traditional project, the design is finished before a contractor is hired. If what’s on paper costs more than the budget, or can’t be built the way it’s drawn, that only surfaces at tender — when redesigning is expensive and the schedule has already been set.
Design-build closes that gap. Architecture, engineering and construction sit under one contract from the start, so cost and constructability are tested as the design develops, not after it’s finished.