DESIGN-BUILD

One contract. One team. Complete accountability.

Design and construction under a single point of responsibility — so there’s no gap between what was designed and what gets built.

Single contract · Integrated design team · Early cost certainty · Faster start on site · One point of accountability

The gap between designed and built

On a traditional project, the design is finished before a contractor is hired. If what’s on paper costs more than the budget, or can’t be built the way it’s drawn, that only surfaces at tender — when redesigning is expensive and the schedule has already been set.

Design-build closes that gap. Architecture, engineering and construction sit under one contract from the start, so cost and constructability are tested as the design develops, not after it’s finished.

Two routes to the same building

TRADITIONAL

Design completed in isolation
Contractor brought in after drawings are done
Final price hidden until bid day
Two contracts, two parties
Expensive redesigns when bids come in high

DESIGN-BUILD

Design and budget developed together
Contractor at the table from day one
Continuous cost certainty as design evolves
One contract, one party
Adjust before it’s drawn, not after

How it runs

One team, one contract, from first sketch to final walkthrough.

01
Define
What the space has to do, what it can cost, when it has to open.
02
Design and price together
Drawings and budget develop side by side, not one after the other.
03
Build
Same team on site. Design questions get answered in hours, not weeks.
04
Hand over
One party responsible for the result. No design-versus-build argument.

When design-build is the right call

And when it isn’t — we’ll tell you either way.

Good fit

The opening date is fixed
Budget matters more than a specific design
Scope is still taking shape
You’d rather manage one relationship

Probably not

Design is already complete
You have an architect you want to keep
Procurement requires competitive tender
The design itself is the point