Years of heat and moisture had taken the cedar past the point of cleaning — staining, water damage and worn bench boards throughout. We stripped the interior back and rebuilt it: new wall and ceiling cladding, benches, backrests, floor slats and heater guard, all in fresh cedar.
Overhead work above a full pool means the water can’t be drained and the lift can’t be repositioned easily. We worked from a boom lift over the deck to complete ceiling repairs, with spotters and access planning agreed before anyone left the ground.